Liollio Architecture

View Original

Dome Steel at the Charleston Airport

Last night the steel for the dome was lifted into place at the terminal roof.  It was adorned with the USA and SC flags along with the signatures and well wishes of the construction team and CHS family!  Tomorrow the construction + design team will celebrate at the "topping out" party to recognize the last piece of major steel, brick, or concrete being placed.

 

More airport construction coverage can be found here: https://www.facebook.com/Charleston.International.Airport